Bitcoin (btc)$73,076.00↓ 2.42%
Ethereum (eth)$2,021.00↓ 5.10%
Tether (usdt)$0.999329↑ 0.01%
BNB (bnb)$672.94↓ 2.07%
USDC (usdc)$0.999628↑ 0.00%
XRP (xrp)$1.047↓ 4.99%
Solana (sol)$82.20↓ 5.41%
TRON (trx)$0.318362↑ 0.27%
Figure Heloc (figr_heloc)$1.046↓ 0.79%
Zcash (zec)$1,029.43↓ 12.79%
Hyperliquid (hype)$71.40↓ 4.86%
Dogecoin (doge)$0.067501↓ 3.69%
Monero (xmr)$557.48↓ 6.22%
USDS (usds)$0.999939↓ 0.03%
LEO Token (leo)$9.33↑ 0.26%
Bitcoin (btc)$73,076.00↓ 2.42%
Ethereum (eth)$2,021.00↓ 5.10%
Tether (usdt)$0.999329↑ 0.01%
BNB (bnb)$672.94↓ 2.07%
USDC (usdc)$0.999628↑ 0.00%
XRP (xrp)$1.047↓ 4.99%
Solana (sol)$82.20↓ 5.41%
TRON (trx)$0.318362↑ 0.27%
Figure Heloc (figr_heloc)$1.046↓ 0.79%
Zcash (zec)$1,029.43↓ 12.79%
Hyperliquid (hype)$71.40↓ 4.86%
Dogecoin (doge)$0.067501↓ 3.69%
Monero (xmr)$557.48↓ 6.22%
USDS (usds)$0.999939↓ 0.03%
LEO Token (leo)$9.33↑ 0.26%

Oklo Completes Borehole Drilling for First Aurora Powerhouse Site – Draper Decentralized – 5.19.25

Published May 19, 2025

Oklo has finished borehole drilling at the Idaho National Laboratory for its first Aurora Powerhouse, advancing efforts to build a next-generation nuclear facility. The site characterization work supports licensing, engineering, and construction planning.https://content1.avplayer.com/65574894b41f5f3465096726/videos/689c325f1e6aa85cbb032ca7/689c329a946e8bc97506c6b7/video.mp4